Major investments by Cengiz İnşaat include Beyhan II Dam and Hydroelectric Power Plant project in progress in Elazığ as well as Aşağı and Yukarı Kaleköy dams in Bingöl which are among the largest dams in Turkey.

BOLD PROJECTS AND INVESTMENTS IN TURKEY
These are the major projects by Cengiz İnşaat.
Project Processes
- Lower Kaleköy Dam and HEPP,
Bingöl/Turkey
Start date, May 2016
Completion date, December 2019
The Kaleköy (293 MW/1293 GWh) and Beyhan (300 MW/1435 GWh) HEPP’s will generate totally 2,7 billion KWh power per year by using the 380 m head between the Muş Plain Outlet and the Keban Dam Reservoir on the Murat Tributary of the Euphrates River. The crete height (height of above thalweg) of the Aşağı Kaleköy Dam, which has an installed capacity of 450 MW, is 88 m.
- Upper Kaleköy Dam and HEPP,
Bingöl/Turkey
Start date, October 2012
Completion date, September 2017
The Kaleköy (293 MW/1293 GWh) and Beyhan (300 MW/1435 GWh) HEPP’s will generate totally 2,7 billion KWh power per year by using the 380 m head between the Muş Plain Outlet and the Keban Dam Reservoir on the Murat Tributary of the Euphrates River. The Kaleköy Dam and HEPP, which will be constructed across the Murat River and have an installed capacity of 300 MW, will be constructed in the city of Bingöl. The crete height (height of above thalweg) of the Yukarı Kaleköy Dam is 137,5 m.
- Cengiz Holding Headquarters,
İstanbul/Turkey
Start date, March 2008
Completion date, July 2012
Cengiz Holding Headquarters, which was constructed in Altunizade District, one of the most important trade centres on the European Side in İstanbul, was constructed on a land of 2.500 m2 and has a construction area of 5.500 m2 in total, with 7 storeys above and under ground. The project, which was completed in 2012, is being used as the new Holding Management Centre.
- Ankara Business Center Building,
Ankara/Turkey
Start date, October 2008
Completion date, May 2012
The Business Center which has a closed area of 26.772 m2 has 7 basements and 12 typical storeys. The following were carried out under the project: 200.000 m3 of excavation; 6.280 linear meters of mini pile; 18.922 linear meters of prestressed anchorage production.
- Cengiz Plaza, Maslak,
İstanbul/Turkey
Start date, June 2002
Completion date, December 2007
Cengiz Plaza, which was constructed in Maslak, the new trade centre of the European Side in İstanbul, has 18 storeys above ground and 6-storey underground car park and has a total area of 15,000 m2.
- Sungate Port Royal Hotel,
Antalya/Turkey
Start date, January 2003
Completion date, April 2005
Sungate Port Royal Resort Hotel, which was constructed and run for 3 seasons by Cengiz İnşaat, has a closed area of 195.000 m2 and is located in Beldibi in Antalya. The hotel is a perfect holiday, amusement and conference centre with its capacity of 3300 beds, conference halls with 6000 seats of different types, SPA centre, marina and lake-side villas. Sungate Port Royal, which is one of the largest and most prestigious hotels in Turkey from any aspect, was opened in April 2005. Sungate Port Royal with its 1-km long private sandy beach, Port Queen – original hotel building – Family Lake Villas, Terrace Houses, Deluxe Villas and Suits, hotel SPA centre that provides all kinds of therapy, skin care and beauty services for both physical and psychological health and is the second largest hotel SPA centre in the world, indoor and outdoor swimming pools with an area of 18.000 m2, glorious aqua parks, select boutiques, restaurant and bars serving the most choice dishes of Turkish, Far-Eastern and world cuisines, Children Kingdom on an area of 20.000 m2, sea and land sports, Hall & Meeting rooms allowing all kinds of meetings, and several other service units is 45 km away from the airport and 25 km away from the city centre.
- Sungate Port Royal Hotel Yacht Harbour,
Antalya/Turkey
Start date, January 2003
Completion date, April 2005
It’s the yacht harbour that belongs to Sungate Port Royal Resort Hotel located in Beldibi in Antalya.
- Samsun II Mobile Power Plant,
Samsun/Turkey
Start date, January 2001
Completion date, February 2003
The construction of the duel fuel mobile power plant, which has 132 MW installed power, also included the works of electromechanhical works, tank area construction, pipelines, switchyard and transmission line. Cengiz Enerji A.Ş. runs the power generation and sale of the plant.
- Le Jardin Resort Hotel,
Antalya/Turkey
Start date, March 1997
Completion date, June 1998
Le Jardin Resort Hotel, which is located in Kemer in Antalya, was constructed on an area of 38,000 m2 in August 1998 and is one of the most comfortable and ideal holiday centres in the area. The hotel, which has private sandy and pebbled beach 200 m in length, was constructed with a capacity of 600 beds and is currently run by Cengiz Holding.
- Cengiz Construction Management Building,
İstanbul/Turkey
Start date, June 1996
Completion date, December 1997
Construction of Management Building in Altunizade.